Dry Fit

Initial assembly to assure fit, identify interference, move parts, add tabs, modify...... ahead of powder coating.

A new inclusion with the Rev 2 kit is carbon fiber floor and interior panels. All nicely laid-up and CNC cut. I have a couple of panels with cuts I don't need but those will be replaced. The side panel maerial weight calcs to about half that of .040 Kydex. The floors are thicker and very rigid. Too bad that pretty finish will get all scuffed up. Angles were added at the door jamb to provide a finished termination. The left side got the same treatment as the plex will mirror the right side door layout.